One of the largest expenses in the operation of any building is the cost of running the energy-consuming systems and equipment. As buildings and equipment age, and building functions change over time, the efficiency of those systems generally degrade; resulting in increased energy costs and decreased comfort. When performing Retro-Commissioning, ESA's primary goals are to return buildings to their most efficient and effective level of functioning, improve indoor environments and minimize operating costs.
Most common Savings opportunities
Equipment Scheduling - turning equipment off when it is not needed or changing operations to take advantage of rate structure or other cost factors for over 50% of the available savings.
Repairs - Restoring systems and their components to correct operation
Programming - Changing the sequence of operation to take advantage of variable loads and changing occupancy schedules.
Other - Reducing volume/ quantity/ losses when possible (example: de-lamping, changing air flow, rewiring)
Representative Clients:
Most common Savings opportunities
Equipment Scheduling - turning equipment off when it is not needed or changing operations to take advantage of rate structure or other cost factors for over 50% of the available savings.
Repairs - Restoring systems and their components to correct operation
Programming - Changing the sequence of operation to take advantage of variable loads and changing occupancy schedules.
Other - Reducing volume/ quantity/ losses when possible (example: de-lamping, changing air flow, rewiring)
Representative Clients:
- Houston ISD
- Cypress-Fairbanks ISD
- Eanes ISD
- Pflugerville ISD
- Klein ISD
- Texas Tech Health Science Center
- Fort Bend ISD
- Alvin ISD
- University of Texas Medical Center - Galveston
ESA Energy Systems Associates copyright 2014